1. 서론
This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.
2. 제품 오버view
The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

그림 1: 이상view of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.
2.1. 키트 구성 요소
- 2x 12V 1.2Ah Sealed Lead-Acid Batteries
- Smart Charger Board
- 배선 마구
- Battery Holder/Mounting Base
- 장착 브래킷
- Fasteners (screws, keys)
- 사용 설명서(본 문서)

그림 2: 상세 view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.
3. 호환성
This battery backup system is compatible with the following BFT gate operator series:
- Deimos BT series of slide gate operators
- VIRGO - LINX
- EOS-SCE
- HYDRA N
- DEIMOS BT-QSC D-NETTUNO S
- SB BAT/SB CARBAT (DEIMOS BT-SB 300)
- BT BAT 2 (URANO BT ARES 1000 & ARES 1500)
- NETTUNO B
- VENERE D
- 아르고
- LIBRA C MA - LIBRA C LX
Ensure your gate operator model is listed above for proper functionality.
4. 설정 및 설치
Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.
4.1. 안전수칙
- 전원 분리: Always turn off the main power supply to the gate operator before installation or maintenance.
- 적절한 도구: Use appropriate tools for electrical connections and mounting.
- 배선: 모든 배선 연결이 안전하고 극성이 올바른지 확인하십시오.
- 환경: Install the kit in a dry, protected location, away from direct weather exposure.
4.2. 설치 단계 (일반 지침)
- Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
- 배터리 삽입: Place the two 12V 1.2Ah batteries into the battery holder.
- 배터리 연결: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
- Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
- 안전한 배선: Route and secure all wiring to prevent pinching or damage.
- 복원력 : Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
- 테스트 시스템 : Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.
5. 사용 설명서
The BFT SB-BAT P125002 operates automatically once installed correctly.
5.1. Normal Operation (Power On)
When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.
5.2. 파워 오우tage Operation (Power Off)
정전이 발생한 경우tage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.
6. 유지관리
Regular maintenance ensures the longevity and reliability of your battery backup system.
6.1. 배터리 충전
전원이 꺼진 후tage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12~14시간. It is important to allow sufficient time for batteries to fully recharge after use.
6.2. Fuse Check
시스템에는 20A 퓨즈 for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.
6.3. 배터리 수명 및 교체
Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).
7. 문제 해결
If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:
- No Power During Outage:
- 모든 배선 연결이 안전하고 올바른지 확인하세요.
- Check the 20A fuse.
- Ensure batteries are fully charged. If recently discharged, allow 12-14 hours for recharging.
- 테스트 배터리 볼륨tage. If below 20.4V (exhausted battery protection threshold), batteries may need replacement.
- 배터리가 충전되지 않음:
- Confirm main power supply to the gate operator is active.
- Check all connections to the smart charger board.
- Inspect the 20A fuse.
- Reduced Operation Time:
- Batteries may be aging and losing capacity. Consider replacement.
- 테스트 전에 배터리가 완전히 충전되었는지 확인하십시오.
For persistent issues, contact BFT technical support or a qualified service technician.
8. 사양
| 특징 | 사양 |
|---|---|
| 모델 번호 | 피125002 |
| 배터리 유형 | 봉인 된 납산 |
| 배터리 용량 | 2x (12V 1.2Ah) |
| 출력 볼륨tage | 24V DC (공칭) |
| 차지볼tage | 27.2V |
| 충전 전류 | 130mA |
| 배터리 충전 시간 | 12-14시간 |
| Exhausted Battery Protection Threshold | 20.4V |
| 퓨즈 등급 | 20A |
| 작동 온도 | Data detected with external temperature of: 25°C (77°F) |
9. 보증 및 지원
For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.
BFT Contact Information: Please visit the official BFT web최신 연락처 정보와 지원 리소스를 확인하려면 사이트를 방문하세요.





