CTS UT-08520, UT-08550, UT-08921, UT-08951

CTS Carburetor Instruction Manual

For Homelite 26cc MightyLite Blower

상표: CTS | 모델: UT-08520, UT-08550, UT-08921, UT-08951

1. 서론

This manual provides essential information for the installation, operation, and maintenance of your new CTS Carburetor. This carburetor is a replacement part designed for specific Homelite 26cc MightyLite Blower models. Proper installation and adjustment are crucial for optimal performance and longevity of your equipment. Please read this manual thoroughly before proceeding with installation.

2. 호환성

This CTS Carburetor (Homelite part No 308028007) is compatible with the following Homelite 26cc MightyLite Blower models:

Please verify your blower's model number before installation to ensure compatibility.

3. 제품 오버view

CTS Carburetor with included gasket, front view

그림 3.1: 앞쪽 view of the CTS Carburetor, showing the primer bulb and fuel inlet/outlet ports. A new gasket is included for proper sealing during installation.

CTS Carburetor with included gasket, angled view

그림 3.2: 각진 view of the carburetor, highlighting the fuel lines and the throttle linkage connection point. The included gasket is visible next to the carburetor.

CTS Carburetor side view

그림 3.3: 옆 view of the carburetor, showing the main body and the fuel intake tube. This view 설치 방향을 정확하게 파악하는 데 도움이 됩니다.

CTS Carburetor top view

그림 3.4: 맨 위 view of the carburetor, illustrating the location of the adjustment screws (if applicable) and the primer bulb assembly.

CTS Carburetor another angled view

그림 3.5: 또 다른 각도 view, providing a comprehensive look at the carburetor's design and connection points.

4. 설치 가이드

4.1 안전 예방 조치

4.2 필요한 도구

4.3 설치 단계

  1. 송풍기를 준비하세요: Ensure the blower is turned off and the engine is cool. Disconnect the spark plug wire. Drain any remaining fuel from the fuel tank into an approved container.
  2. 기화기에 접근하세요: Remove any air filter covers, air filters, or other components that obstruct access to the carburetor. Note the routing of fuel lines and throttle linkage. Taking photos can be helpful.
  3. 연료 라인을 분리하십시오: Carefully disconnect the fuel lines from the old carburetor. Be prepared for residual fuel to leak. Use fuel line clamps if available to minimize spillage.
  4. 스로틀 링크를 분리하십시오: Detach the throttle linkage from the old carburetor. Pay attention to how it connects.
  5. 기존 기화기를 제거하세요: Unscrew the mounting bolts or nuts holding the old carburetor in place. Remove the old carburetor and any old gaskets.
  6. 깨끗한 장착 표면: Clean the engine's mounting surface thoroughly to ensure a proper seal with the new gasket.
  7. 새로운 개스킷 설치: Place the new gasket (included with your CTS Carburetor) onto the mounting surface. Ensure it is correctly oriented.
  8. 새 기화기를 장착하세요: Position the new CTS Carburetor onto the gasket and align it with the mounting holes. Secure it with the original mounting bolts/nuts. Do not overtighten.
  9. Connect Throttle Linkage: Reattach the throttle linkage to the new carburetor. Ensure it moves freely and operates the throttle plate correctly. Note: Some models may require modification or reuse of the original throttle lever if the new carburetor's lever is incompatible.
  10. 연료 라인을 연결하세요: Reconnect the fuel lines to the appropriate ports on the new carburetor. Ensure connections are secure and free of leaks.
  11. 재조립: 분해 과정에서 제거했던 에어 필터, 에어 필터 커버 및 기타 부품들을 다시 설치하십시오.
  12. 연료 보급 및 테스트: Refill the fuel tank with the appropriate fuel mixture for your Homelite blower. Reconnect the spark plug wire. Prime the carburetor by pressing the primer bulb until fuel is visible. Start the engine and check for proper operation and any fuel leaks.

5. 작동 및 조정

5.1 초기 시동

After installation, ensure all connections are secure. Prime the carburetor by pressing the primer bulb several times until it feels firm and fuel is visible in the lines. Follow your Homelite blower's specific starting procedure.

5.2 기화기 조정

Your new carburetor may require fine-tuning for optimal performance. Most small engine carburetors have adjustment screws for idle speed and fuel mixture (high and low speed). These screws are often capped for emissions compliance.

중요한: Refer to your specific Homelite blower's owner's manual or service manual for detailed carburetor adjustment procedures and specifications. If you are unsure, consult a qualified small engine technician.

6. 유지관리

Regular maintenance ensures the longevity and proper function of your carburetor and blower.

7. 문제 해결

This section addresses common issues you might encounter after installing the new carburetor.

문제가능한 원인해결책
Engine will not start or starts and immediately dies.No fuel reaching the engine; improper fuel mixture; clogged fuel filter.Ensure primer bulb is working and fuel lines are connected correctly. Check fuel filter. Adjust fuel mixture if accessible.
Primer bulb not drawing fuel or stays depressed.Internal blockage in carburetor; faulty primer bulb; air leak in fuel lines.Check fuel line connections for tightness. Inspect primer bulb for cracks. If blockage is suspected, carburetor may need cleaning or replacement.
Engine runs rough or stalls at idle.Incorrect idle speed adjustment; dirty air filter; fuel quality issues.Adjust idle speed screw. Clean or replace air filter. Use fresh, clean fuel.
Throttle lever incompatibility.New carburetor's throttle lever does not match original.Attempt to reuse the throttle lever from your original carburetor if possible. If not, contact the manufacturer for compatible parts or solutions.

8. 사양

기인하다
제품 치수5 x 3.1 x 3.5 인치
품목 무게4 온스
한국어:667673501236
Homelite Part No.308028007

9. 보증 및 지원

For information regarding warranty coverage or technical support for your CTS Carburetor, please refer to the original purchase documentation or contact the manufacturer directly. Keep your proof of purchase for any warranty claims.

For specific operational or repair details concerning your Homelite 26cc MightyLite Blower, always consult the original Homelite owner's manual or contact Homelite customer service.

관련 문서 - UT-08520, UT-08550, UT-08921, UT-08951

사전view CTS FWR5-3105 광섬유 단말 장치 사용자 설명서
CTS FWR5-3105 광섬유 단말 장치의 사용 설명서로, 설치, 표시등, 연결, 무선 설정 및 관리 인터페이스 접근 방법에 대한 내용을 다룹니다.
사전view CTS 열 관리 제품 카탈로그: 방열판, 열 링크 및 고정 장치
Explore the comprehensive CTS catalog of thermal management solutions, featuring a wide range of heat sinks, thermal links, and ZIF circuit board retainers for electronic applications. Find detailed specifications and part numbers.
사전view CTS MP 시리즈 석영 수정 데이터시트
Explore the specifications and applications of the CTS MP Series Quartz Crystals, featuring the HC-49/U package and a frequency range from 1.8432 to 64 MHz. Ideal for microprocessor, telecommunication, industrial, consumer electronics, and networking applications.
사전view CTSLV315QG IC Clock Buffer - CTS Electronic Components Datasheet
Detailed specifications and datasheet for the CTSLV315QG IC Clock Buffer from CTS Electronic Components. Find part number, voltage, frequency, and RoHS status.
사전view CTS Thermal Management Products Catalog
Explore the CTS Electronic Components catalog for advanced thermal management solutions, featuring a wide array of heat sinks, ZIF circuit board retainers, thermal links, and fan tops. Ideal for automotive, computer, telecommunications, and military applications.
사전view Mangueras y Conexiones CTS: Catálogo de Productos Hidráulicos e Industriales
Explore el extenso catálogo de Mangueras y Conexiones CTS, que incluye una amplia gama de mangueras hidráulicas, conexiones, adaptadores, coples y productos para automatización de marcas líderes como Ryco, Macom y Koman.