APC AR7580A

APC AR7580A 수직 케이블 관리자 사용 설명서

Model: AR7580A

1. 서론

The APC AR7580A Vertical Cable Manager is designed to provide efficient and organized cable routing within Netshelter racks. This product helps maintain a clean and functional server environment by managing network and power cables, reducing clutter, and improving airflow. This manual provides essential information for the proper installation, use, and maintenance of your AR7580A Vertical Cable Manager.

Key features include durable construction and high efficiency in cable organization.

2. 제품 오버view

The AR7580A Vertical Cable Manager consists of a robust frame with multiple cable fingers and brush strips designed to guide and secure cables. It is supplied as a 2-quantity set, allowing for comprehensive cable management solutions within your rack.

APC AR7580A Vertical Cable Manager, front view

그림 1: 전면 view of the APC AR7580A Vertical Cable Manager, showing the main structure and cable routing fingers.

APC AR7580A Vertical Cable Manager, side view with cable fingers

그림 2: 측면 view of the APC AR7580A Vertical Cable Manager, highlighting the individual cable fingers for organized routing.

3. 안전 정보

Please read and understand all safety instructions before installing or using this product. Failure to do so may result in injury or damage to equipment.

  • Always ensure the rack is stable and properly secured before installing any accessories.
  • 설치에 적합한 도구를 사용하십시오.
  • Do not overload the cable manager with excessive cables, as this can impede airflow and strain mounting points.
  • 설치 중에는 손과 손가락이 움직이는 부품에 닿지 않도록 하십시오.

4. 패키지 내용

설치를 시작하기 전에 모든 구성 요소가 있는지 확인하세요.

  • 2 x APC AR7580A Vertical Cable Managers
  • Mounting hardware (screws, cage nuts, washers - typically included with Netshelter racks or cable manager)

품목이 누락되었거나 손상된 경우 즉시 공급업체에 문의하세요.

5. 설정 및 설치

The APC AR7580A Vertical Cable Manager is designed for easy installation into APC Netshelter racks. Follow these steps for proper mounting:

  1. 랙을 준비하세요: Ensure the Netshelter rack is properly assembled and secured. Identify the desired location for the vertical cable managers, typically along the side channels of the rack frame.
  2. Position the Manager: Align one of the vertical cable managers with the mounting holes on the rack frame. The cable fingers should face inwards towards the rack equipment.
  3. Secure the Manager: Using the appropriate mounting hardware (e.g., M6 screws and cage nuts), attach the cable manager to the rack frame. Start by loosely fastening a few screws at the top and bottom, then proceed to secure all mounting points. Ensure the manager is level and firmly attached.
  4. Repeat for Second Manager: Install the second vertical cable manager on the opposite side of the rack or in another desired location, following the same procedure.
APC AR7580A Vertical Cable Manager installed in a rack, door open

Figure 3: The AR7580A Vertical Cable Manager installed within a Netshelter rack, viewed with the side door open.

Close-up of cables routed through the APC AR7580A Vertical Cable Manager

그림 4: 자세한 view of cables neatly routed through the cable management fingers of the AR7580A.

6. Cable Routing Guidelines

Once installed, the vertical cable managers facilitate organized cable routing:

  • Separate Cable Types: Whenever possible, separate power cables from data cables to minimize electromagnetic interference.
  • Use Cable Fingers: Route cables through the individual fingers of the manager. This provides support and prevents cables from sagging or obstructing airflow.
  • 급하게 구부러진 곳은 피하세요: Ensure cables are not bent too sharply, especially fiber optic cables, to prevent damage and signal loss.
  • Leave Service Loops: Allow for a small amount of slack (service loop) in cables to facilitate future maintenance or equipment changes without disconnecting other devices.
  • Secure with Ties: Use hook-and-loop cable ties (not included) to bundle cables within the manager for additional neatness and security. Avoid using plastic zip ties that can overtighten and damage cables.
Organized cables within a rack using the APC AR7580A Vertical Cable Manager

그림 5: example of well-managed cables within a rack, utilizing the AR7580A for vertical organization.

7. 유지관리

The APC AR7580A Vertical Cable Manager requires minimal maintenance to ensure continued performance:

  • 정기 검사: Periodically inspect the cable managers for any signs of damage, loose mounting, or excessive cable buildup.
  • 청소: Dust and debris can accumulate over time. Use a soft, dry cloth to wipe down the surfaces of the cable manager. For stubborn dirt, a slightly damp cloth can be used, ensuring no moisture enters sensitive equipment.
  • Cable Reorganization: As equipment changes or additions occur, review and reorganize cables as needed to maintain optimal airflow and accessibility.

8. 문제 해결

Most issues related to cable management can be resolved by reviewing installation and routing practices.

  • Cable Congestion: If cables are too tightly packed, they can impede airflow and make future maintenance difficult. Re-route cables, potentially utilizing additional cable management accessories if necessary.
  • Loose Manager: If the cable manager feels loose, check all mounting screws and ensure they are securely tightened.
  • 손상된 케이블: If cables appear pinched or damaged, inspect the routing path and ensure no sharp edges or excessive pressure points are present. Replace damaged cables immediately.

9. 사양

기인하다
상표항공우주국(APC)
모델 번호AR7580A
제품 치수37.75 x 6.5 x 8인치(95.89 x 16.51 x 20.32cm)
품목 무게9.9파운드(4.49kg)
색상검은색
재료플라스틱
호환 장치Server (Netshelter Racks)
수량2

10. 보증 및 지원

For warranty information or technical support regarding your APC AR7580A Vertical Cable Manager, please refer to the official APC website or contact APC customer service directly. Keep your purchase receipt and product model number (AR7580A) available when contacting support.

APC Customer Support: www.apc.com/us/en/support/

관련 문서 - AR7580A

사전view APC NetShelter VL 인클로저 전면 도어 AR7002 설치 가이드
APC NetShelter VL 인클로저 전면 도어(AR7002)의 종합 설치 가이드입니다. 단계별 지침과 자세한 도표 설명을 통해 도어 설치, 제거 및 방향 전환 방법을 알아보세요.
사전view APC NetShelter AR1000, AR1001, AR1100 설치 및 사용자 설명서
본 설명서는 AR1000, AR1001, AR1100 모델을 포함한 American Power Conversion(APC) NetShelter 랙 인클로저의 설치, 설정 및 유지 관리에 대한 자세한 지침을 제공합니다. 제품 목록, 주의 사항, 구성, 수평 조정, 안정화 및 보증 정보를 다룹니다.
사전view APC NetShelter VL AR7002 전면 도어 설치 설명서 | 슈나이더 일렉트릭
APC NetShelter VL AR7002 전면 도어 설치에 대한 자세한 설명입니다. 인클로저 도어의 설치, 제거 및 방향 전환 방법을 알아보세요.
사전view APC NetShelter VL 인클로저 전면 도어 AR7002 설치 설명서
APC NetShelter VL 인클로저 전면 도어(AR7002)의 종합 설치 가이드입니다. 재고 관리, 도어 설치, 제거 및 방향 전환 절차를 다루며, 도표에 대한 자세한 설명이 포함되어 있습니다.
사전view APC NetBotz 로프 누출 센서 NBES0308 설치 가이드
APC NetBotz 로프 누출 센서(NBES0308) 설치 지침으로, NetBotz 랙 모니터 450 및 550에 필요한 재고, 설정 및 연결 요구 사항을 자세히 설명합니다.
사전view APC Smart-UPS 1200/1500 VA 설치 가이드
이 설치 가이드는 APC Smart-UPS 1200/1500 VA 랙 마운트 1U 장치 설치에 필요한 필수 안전 지침과 단계별 절차를 제공합니다. 제품 기능, 배터리 안전 수칙 및 랙 설치에 대해 알아보세요.