1. 환영합니다
The EARU EASEM-D Multi-Circuit Power Meter helps you monitor the amount of electricity consumed and produced in your facility by connecting current transformers (CT clamps) to the power cable.
이 가이드는view of the product and assists you with the initial setup and installation.
주요 특징:
- Tuya compliant: Supports automation with other Tuya devices.
- Compatible with Single, Split-Phase 120/240VAC, and 3-Phase/4-wire 480Y/277VAC electricity systems.
- Remotely monitors whole home energy and up to 16 individual circuits with 50A Sub CTs (e.g., solar, lighting, receptacles).
- Bi-Directional measurement.
- Vol의 실시간 측정tage, Current, Power Factor, Active Power, and Frequency.
- Historical data of Energy Consumed and Energy Production.
2. 안전 취급
경고: 아래 안전 수칙을 준수하지 않을 경우 화재, 감전, 기타 부상 또는 전력량계 및 기타 재산 피해가 발생할 수 있습니다. 전력량계를 사용하기 전에 아래의 모든 안전 수칙을 읽어 주십시오.
- 높은 습도나 극단적인 온도를 피하십시오.
- 직사광선이나 강한 자외선에 장시간 노출되는 것을 피하십시오.
- 기기를 떨어뜨리거나 강한 진동에 노출시키지 마십시오.
- 제품을 임의로 분해하거나 수리하려고 하지 마십시오.
- 장치 또는 액세서리를 가연성 액체, 가스 또는 기타 폭발물에 노출시키지 마십시오.
Important Safety Information for Installation:
- 전력계는 자격을 갖춘 전기 기술자만이 설치하고 서비스해야 합니다.
- 테스트 중에는 장치의 단자를 만지지 마십시오.
- 보조 장치에 연결하거나 분리하기 전에 전원을 끄십시오.
- 적절한 정격 볼륨으로 전원이 꺼졌는지 다시 확인하세요.tag전자 감지 장치.
이 지침을 따르지 않으면 사망이나 심각한 부상을 입을 수 있습니다.
3. 기기를 알아보세요
The EARU EASEM-D Multi-Circuit Power Meter consists of the main unit and various accessories. Familiarize yourself with each component:

그림 1: 제품 구성 요소
메인유닛 오버view:

Figure 2: Main Unit Ports
- LED 표시등: Provides status information (see Troubleshooting section).
- 3.5mm Audio Ports (Top): Inputs for Main CTs (L1/A, L2/B, L3/C).
- 2.5mm Audio Ports (Sides): Inputs for Sub CTs.
- 안테나 커넥터: 외부 안테나를 연결합니다.
- Power Input Port (Bottom): 전원 케이블을 연결합니다.
- 재설정 버튼: Used for resetting the device (see Troubleshooting section).
4. 기술 사양

그림 3: 제품 치수 및 매개변수
무선 연결
| 특징 | 사양 |
|---|---|
| 와이파이 | 802.11b/g/n @ 2.4GHz |
| RF 특성 | Operating frequency: 2.4GHz, External magnetic antenna |
물리적 사양
| 특징 | 사양 |
|---|---|
| 운영 볼륨tage | 90~480VAC 50/60Hz |
| 정격 전류 | 200A / 300A (모델에 따라 다름) |
| 측정 정확도 | ±2% |
| 지원 시스템 | Single-Phase up to 277VAC line-neutral, Split-Phase 120/240VAC, Three-Phase up to 480Y/277VAC (No Delta/wye/Y/Star Connection) |
| 보고 주기 | 15초마다 |
| 작동 온도 | -20℃~+55℃ |
| 습기 | ≤ 90% 비응축 |
| 치수 | 111.3(길이) x 81.2(폭) x 41.4(높이) mm |
| 배터리 포함 | 아니요 |
| 고위험 화학물질 | 없음 |
| 인증 | CE, FCC |
CT Clamp 명세서:
| 모델 | 길이(mm) | W (mm) | H (mm) | Φ (mm) | 무게(g) |
|---|---|---|---|---|---|
| 50A | 26 | 24 | 42 | 10 | 57 |
| 200A / 300A | 34 | 45 | 66 | 24 | 160 |
5. 설치
메모: The Power Meter must be installed and serviced only by qualified electrical personnel. Always turn off power before installation.
5.1. 전원 끄기
You need to turn off the main breaker in your electric panel to shut off all of the power in your home. However, the service mains are always live! Then remove screws securing the cover to the panel to access the circuit breakers.

Figure 4: Turning off Main Breaker
5.2. Find a Spot for Power Meter
Find a suitable spot for the Power Meter. You can fit it within your electrical panel or use the mounting bracket to fix it on the wall outside the electrical panel if there is no room.

그림 5: 장착 옵션
5.3. 안테나 설치
Locate the External Antenna outside the electrical panel to ensure that the Power Meter signal is not blocked by metal. The base of the antenna has a magnet and can be adsorbed on iron materials. After that, screw the External Antenna to the Antenna connector.
전력계를 전기 패널에 설치하는 경우 드라이버를 사용하여 전기 패널의 녹아웃 덮개를 뚫을 수 있습니다. 그런 다음 구멍을 통해 외부 안테나 케이블을 넣습니다.

Figure 6: Antenna Installation
5.4. 클amp Main CTs around Service Mains
1. Open the clasps on the Main CTs (3.5mm audio plug) to see the arrow (P1→P2 or K→L) or find it on the sticker on the outside of the clamp. This indicates the direction of the CT.

그림 7: CT Clamp 방향
2. 클amp one Main CT on each main service line. Make sure the arrow on the CT must point towards the breakers! Your system may have 1, 2, or 3 main service lines, and a corresponding number of Main CTs are required.

Figure 8: Main CT Installation (3-Phase)
3. If you have Line/Service-side tap solar, the Main CT must be clamp전기 계량기와 인버터에서 들어오는 전원 사이에 연결이 되어 있습니다.

Figure 9: Main CT Installation with Solar
4. Insert each 3.5mm audio plug of the Main CT into the corresponding audio jack on the top of the Power Meter. The jacks are labeled L1/A, L2/B, and L3/C.

Figure 10: Main CT Plug Connections
5.5. 전원 케이블 연결
전원 케이블을 본체 하단에 찰칵 소리가 날 때까지 연결하세요.

그림 11: 전원 케이블 연결
Secure the N wire from the power cable to the neutral bus bar and the L1 wire to the L1/A breaker pole.
For 3-Phase systems, secure the L2, L3 wires corresponding to the L2/B, L3/C breaker poles.
For Split-Phase systems, only secure the L2 wire to the L2/B breaker pole. The L3 wire needs to connect to the neutral bus bar.
For Single Phase systems, the L2 and L3 wires need to connect to the neutral bus bar.
5.6. 클amp Sub CTs around the Circuit (Optional)
If you don't have Sub CTs (2.5mm audio plug), skip this step.
1. Open the clasps on the Sub CTs to see the arrow (P1→P2 or K→L) or find it on the sticker on the outside of the clamp. This indicates the direction of the CT.

Figure 12: Sub CT Clamp 방향
2. 클amp each Sub CT around the circuit you wish to monitor. Make sure the arrow on the CT must point towards the load or Inverter!

Figure 13: Sub CT Installation
메모: If the circuit you are monitoring can generate energy (such as an Inverter), after all wiring is completed, you must manually set the phase of the circuit in the app settings, otherwise the power measurement will be incorrect.
3. Insert each 2.5mm audio plug of the Sub CT into the audio jack on the side of the Power Meter. Remember the number of the audio jack connected to the circuit you are measuring, and you may need to match it in your app.
5.7. Wiring Reference Diagrams
Refer to the following diagrams for common wiring configurations:

Figure 14: 3-Phase Wiring (Most in European 3-phase homes and US Commercial systems)

Figure 15: Split-Phase Wiring with Load Monitoring (Most in US homes)

Figure 16: Split-Phase Wiring with Solar Monitoring (Most in US homes)

Figure 17: Single Phase Wiring (Most in European 1-phase homes)
6. 장착
The mounting bracket supports DIN-rail installation. You can click the three hooks on the mounting bracket onto the DIN-rail.

Figure 18: Mounting Bracket to DIN-Rail
Locate the hooks of the mounting bracket and line up the hooks with the mounting holes on the Power Meter. Fit the hooks into the mounting holes as shown in the picture. Installation is now completed.
7. 네트워크 구성
The device uses the Smart Life app for network configuration and monitoring. Note that the network cannot support 5GHz Wi-Fi!
7.1. 앱 다운로드
신청서를 다운로드하세요: 스마트 라이프 from your App Store or App Market. You can also scan the QR code below to download and install.

Figure 19: Smart Life App QR Code
7.2. Network Configuration Methods
Here are three methods for device network configuration:
Method 1: Automatic Scan (Recommended)
- After the device is installed, power on the power clamp.
- Reset the device: Press and hold the reset button for 5 seconds until the LED indicator flashes red 3 times quickly.
- Open the Smart Life app and click the 'Scan' button in the upper right corner of the App Home page.
- The app will automatically scan for nearby devices and a prompt box will pop up. Click 'Add'.
- Enter your home Wi-Fi account and password (2.4GHz only) and click 'Next'.
- Wait for the device to be added and click 'Done'. The device has successfully configured the network.
Video: Installation and Network Configuration Guide
Method 2: Manual Scan with QR Code
- After the device is installed, power on the power clamp.
- Reset the device: Press and hold the reset button until the LED flashes red quickly 3 times.
- Open the manual to page 20 to see the QR code.
- Open the Smart Life app and click the 'Scan' button in the upper right corner of the App Home page. Scan the QR code from the manual.
- A prompt box will pop up. Click 'Add'.
- Enter your home Wi-Fi account and password (2.4GHz only) and click 'Next'.
- Wait for the device to be added and click 'Done'. The device has successfully configured the network.
Method 3: Manual Add with Bluetooth
- After the device is installed, power on the power clamp.
- LED 표시등이 녹색으로 깜박이는지 확인하십시오. 그렇지 않은 경우 재설정하십시오.
- Open the Smart Life app and turn on Bluetooth on your phone.
- Open the app and click the '+' on the top right of the home page to add the device.
- Find the 'Energy' option and click 'Switch Module (Wi-Fi)' in the subdirectory 'Breaker'.
- Enter your home Wi-Fi account and password (2.4GHz only) and click 'Next'.
- Click 'Confirm the indicator is blinking'.
- The device indicator light flashes quickly, click 'Blink Quickly'.
- Wait for it to be added and click 'Done'. The device has successfully configured the network.
8. Operating the Device via Smart Life App
Once successfully configured, you can monitor and control your power meter through the Smart Life app.
8.1. 실시간 모니터링
The app provides real-time data on energy consumption and production. You can view:
- Net Usage, Solar Usage, Home Usage.
- Energy 'To Grid' and 'From Grid'.
- Total Active Power, Total Current, Frequency.
- Individual circuit data (Active Power, Current, Voltag이자형).

Figure 20: App Home Screen - Energy Overview
8.2. Historical Data and Charts
Access historical data and charts to track energy trends over time (Day, Week, Month, Year).

Figure 21: App Charts and Historical Data
8.3. Settings and Configuration
Within the app settings, you can configure various parameters:
- Circuit Setting: Enable or disable individual circuits for monitoring.
- Solar Setting: Configure settings related to solar production monitoring.
- 비율: Set unified price per kWh and billing cycle start.
- 단위: Select energy units (e.g., kWh, Amp에스).

Figure 22: App Settings
8.4. 음성 제어
The device supports voice control through Google Assistant and Amazon Alexa, allowing for hands-free operation.

그림 23: 음성 제어 통합
9. 유지관리
The EARU EASEM-D Multi-Circuit Power Meter is designed for low maintenance. Keep the device clean and free from dust. Ensure all connections are secure. No user-serviceable parts are inside the main unit; do not attempt to open or repair it.
10. 문제 해결
10.1. 리셋 버튼
Press and hold the reset button for 5 seconds until the LED indicator flashes red 3 times quickly to restore the Power Meter to default factory settings (energy data will not be cleared).
에너지 데이터를 지우려면 기기를 삭제하고 앱의 데이터를 삭제한 후 다시 추가해 주세요.
10.2. LED 표시등 상태
The LED status gives the following information about the Power Meter:
| LED 상태 | 그것이 의미하는 바 |
|---|---|
| 녹색 LED 깜박임 | 페어링을 기다리는 중 |
| 녹색 LED 켜짐 | 기기가 클라우드에 연결되었습니다. |
| 빨간색 LED 켜짐 | 장치가 라우터에 연결되었지만 클라우드에 연결하지 못했습니다. |
| 빨간색 LED 깜박임 | Wi-Fi가 구성되었지만 라우터에 연결하지 못했습니다. |
11. 사용자 팁
- 홈 어시스턴트 통합: As the device is Tuya compliant, it may be possible to integrate it with Home Assistant or other smart home platforms that support Tuya devices. Check the specific integration guides for your chosen platform.
- Wi-Fi 네트워크 : Remember that the device only supports 2.4GHz Wi-Fi networks. Ensure your router is configured to provide a 2.4GHz band or that your phone is connected to the 2.4GHz band during setup.
12. 보증 및 지원
For warranty information, technical support, or service inquiries, please contact EARU customer service or refer to the official product page where you purchased the device. Keep your purchase receipt as proof of purchase.