2 KW Geyser Heating Element

Altro 2 Vertical Geyser Heating Element: Installation and Maintenance Guide

Model: 2 KW Geyser Heating Element | Brand: Generic

소개

This manual provides comprehensive instructions for the safe installation, operation, and maintenance of the Generic Altro 2 Vertical Geyser Heating Element. This element is designed for efficient and durable performance in 15-50 liter Altro 2 geysers. Please read this guide thoroughly before installation and use to ensure proper function and safety.

안전 정보

WARNING: Electrical shock hazard. Installation and maintenance should only be performed by qualified personnel. Disconnect power to the geyser before proceeding with any installation or maintenance.

  • Ensure the main power supply to the geyser is switched off and locked out before beginning any work.
  • Always wear appropriate personal protective equipment (PPE), including insulated gloves and safety glasses.
  • Verify that the replacement heating element specifications (voltag전자, 와트tage) match the original element and your geyser's requirements.
  • Do not operate the geyser without water. This can damage the heating element and the geyser.
  • 설치하기 전에 부품에 손상이 있는지 검사하십시오. 손상된 부품은 설치하지 마십시오.
  • 모든 전기 연결부가 단단히 고정되어 있고 적절하게 절연되어 있는지 확인하십시오.
  • This heating element is designed for water heating applications only. Do not use for other purposes.

패키지 내용

패키지에는 일반적으로 다음이 포함됩니다.

  • Altro 2 Geyser Heating Element
  • 장착 하드웨어(종류는 다를 수 있음)
  • 설치 설명서(본 문서)

명세서

모델명RAcold Altro2 Vertical (Compatible)
2000와트(2kW)
권tage230볼트(AC)
재료고품질 구리
플랜지 직경111mm(XNUMXmm)
제품 치수11.1L x 11.1W x 27H 센티미터
품목 무게300 - 370 Grams (approx.)
특징충격 증명
호환성15 to 50 liter Altro 2 Geysers

설정 및 설치

This section outlines the general steps for replacing a geyser heating element. Specific steps may vary based on your geyser model. If unsure, consult a qualified technician.

  1. 전원 분리: Locate the main power switch for your geyser and turn it OFF. For added safety, consider turning off the main circuit breaker for your home.
  2. Drain Geyser: Turn off the cold water supply to the geyser. Open a hot water faucet in your home to relieve pressure and allow the geyser to drain. Connect a hose to the geyser's drain valve and direct it to a floor drain or outside. Open the drain valve to completely empty the geyser.
  3. 접근 요소: Once the geyser is empty, locate the heating element access panel, usually at the bottom or side of the geyser. Remove the cover.
  4. 배선 분리: Carefully disconnect the electrical wires from the old heating element terminals. Note their positions or take a photo for reassembly.
  5. 이전 요소 제거: Use a suitable wrench or element removal tool to unscrew the old heating element from the geyser tank. Be prepared for any residual water.
  6. 검사 및 청소: Inspect the geyser tank opening for any debris or scale. Clean the area thoroughly.
  7. 새로운 요소 설치: Insert the new Altro 2 Geyser Heating Element into the opening. Ensure the gasket is properly seated to prevent leaks. Tighten the element securely with the wrench. Do not overtighten.
  8. 배선을 다시 연결하세요: Reconnect the electrical wires to the new heating element terminals, ensuring they match the original configuration.
  9. Refill Geyser: Close the geyser's drain valve. Turn on the cold water supply to the geyser. Open a hot water faucet in your home to allow air to escape as the tank fills. Once water flows steadily from the hot faucet, the geyser is full. Close the hot faucet.
  10. 복원력 : Replace the access panel cover. Turn the main power supply to the geyser back ON.
Altro 2 Vertical Geyser Heating Element

이미지 1: 앞면 view of the Altro 2 Vertical Geyser Heating Element. This shows the main heating coils and the thermostat probe.

Altro 2 Geyser Heating Element Flange

이미지 2: 하단 view of the heating element flange, showing the electrical terminals and mounting holes.

작동 지침

Once the heating element is installed and the geyser is refilled with water, the unit is ready for operation.

  • Ensure the geyser is completely filled with water before turning on the power. Operating an empty geyser will damage the heating element.
  • Turn on the power supply to the geyser.
  • Allow sufficient time for the water to heat up. The heating time will depend on the geyser capacity and the desired temperature.
  • The geyser's thermostat will regulate the water temperature. Refer to your geyser's original manual for thermostat adjustment instructions.

유지

Regular maintenance helps prolong the life of your heating element and geyser.

  • 연례 검사: It is recommended to have your geyser and heating element inspected annually by a qualified technician.
  • 양극봉 점검: The geyser's anode rod protects the tank from corrosion. Check and replace it as needed, typically every 3-5 years, or more frequently in areas with hard water.
  • Sediment Flush: Periodically drain and flush your geyser to remove sediment buildup, which can reduce efficiency and lifespan of the element.
  • 요소 세척: If removing the element for inspection, gently clean any scale buildup with a non-abrasive brush. Avoid harsh chemicals.
  • 전기 연결: 모든 전기 연결이 단단히 고정되어 있고 부식이 없는지 확인하세요.

문제 해결

If your geyser is not heating water or experiencing issues after element replacement, consider the following:

문제가능한 원인해결책
뜨거운 물이 없습니다No power to geyser; tripped circuit breaker; faulty thermostat; element not connected properly.Check power supply and circuit breaker. Ensure element wiring is secure. Consult a technician for thermostat issues.
물이 충분히 뜨겁지 않음Thermostat set too low; sediment buildup; faulty element.Adjust thermostat. Flush geyser for sediment. If element is faulty, replace it.
Leaking around elementElement not tightened sufficiently; damaged gasket; faulty element flange.Tighten element (do not overtighten). Replace gasket. Inspect element flange for damage.
타는 냄새Loose electrical connection; element operating without water.Immediately disconnect power. Check wiring. Ensure geyser is full of water. Seek professional help.

Always disconnect power before attempting any troubleshooting or repairs. If you are unsure about any step, contact a qualified technician.

보증 정보

This Altro 2 Geyser Heating Element typically comes with a 1년 보증 from the date of purchase. The warranty covers manufacturing defects under normal use conditions. It does not cover damage due to improper installation, misuse, neglect, or acts of nature.

Please retain your purchase receipt as proof of warranty. For warranty claims, contact your retailer or the manufacturer.

고객 지원

For installation assistance, product inquiries, or technical support, please contact the manufacturer or your retailer. You may also refer to the contact information provided on the product packaging or your purchase documentation.

Manufacturer Contact: Insta Hot India +91 9420469198

관련 문서 - 2 KW Geyser Heating Element

사전view Heliosa 66 Black Infrared Heater Installation and Replacement Guide
A comprehensive guide for installing and replacing the heating element in the Heliosa 66 Black infrared heater, with detailed instructions and safety precautions.
사전view EMKE 스마트 발열체: 설치 및 사용 설명서
EMKE 스마트 발열체의 설치 및 사용 설명서로, 설치, 작동, 앱 제어, 안전 지침 및 폐기 방법에 대한 모든 내용을 포함합니다.
사전view 이스트브룩 B형 Wi-Fi 발열체: 사용 설명서
안전, 작동, 기술 사양, 앱 제어 등을 다루는 Eastbrook Type B Wi-Fi 발열체에 대한 포괄적인 사용 설명서입니다.
사전view Dewhot ND16CTDH 16L 정온 가스 온수기 사용 설명서 및 설치 가이드
Dewhot ND16CTDH 16L 정온 가스 온수기의 설치, 작동, 안전, 유지 관리 및 문제 해결에 대한 종합 안내서입니다.
사전view Ecostrad Standard 발열체: 설치, 사용 및 안전 설명서
Ecostrad 표준형 발열체에 대한 종합적인 사용 설명서로, 설치, 기술 사양, 안전 예방 조치, 보증 및 폐기에 대한 내용을 담고 있습니다. Ecostrad 발열체의 안전하고 정확한 작동을 보장합니다.
사전view SAFIELINA 스마트 발열체 설치 및 사용 설명서
SAFIELINA 스마트 발열체의 설치 및 사용 설명서로, 안전, 설치, 기술 사양, 수동 작동, WiFi를 통한 앱 제어, 문제 해결, 재설정 및 폐기에 대한 내용을 다룹니다.